[1]
|
李会杰.接触线机械可靠性研究[J].铁道工程学报,2008,(8):75-79 Li H J. Research on the mechanical reliability of contact line[J]. Journal of Railway Engineering Society, 2008,(8):75-79(in Chinese)
|
[2]
|
杨媛,吴俊勇,吴燕,等.基于可信性理论的电气化铁路接触网可靠性的模糊评估[J].铁道学报,2008,30(6):115-119 Yang Y, Wu J Y, Wu Y, et al. Fuzzy reliability evaluation of electrified railway catenary system based on credibility theory[J]. Journal of the China Railway Society, 2008,30(6):115-119(in Chinese)
|
[3]
|
詹广振.基于可靠性的接触网检修优化研究[D].北京:清华大学,2009:3-20 Zhang G Z. The studies of OCS maintenance optimization based on its reliability[D]. Beijing:Tsinghua University, 2009:3-20(in Chinese)
|
[4]
|
万毅,邓斌,李会杰,等.接触线的疲劳可靠性[J].西南交通大学学报,2006,41(2):214-217 Wan Y, Deng B, Li H J, et al. Fatigue reliability of contact wire[J]. Journal of Southwest Jiaotong University, 2006,41(2):214-217(in Chinese)
|
[5]
|
曹树森,邓斌,马素君,等.接触线风振疲劳可靠性分析[J].机械科学与技术,2011,30(10):1664-1668 Cao S S, Deng B, Ma S J, et al. Fatigue reliability analysis of contact wire under wind load[J]. Mechanical Science and Technology for Aerospace Engineering, 2011,30(10):1664-1668(in Chinese)
|
[6]
|
毕继红,陈花丽,任洪鹏.基于雨流计数法的接触线疲劳寿命分析[J].铁道学报,2012,34(6):34-39 Bi J H, Chen H L, Ren H P. Analysis on fatigue life of contact wire based on rain-flow counting method[J]. Journal of the China Railway Society, 2012,34(6):34-39(in Chinese)
|
[7]
|
陈花丽.高速铁路接触网的疲劳寿命分析[D].天津:天津大学,2012:10-51 Chen H L. The fatigue life analysis of high-speed railway contact system[D]. Tianjin:Tianjin University, 2012:10-51(in Chinese)
|
[8]
|
陈兴强.接触线疲劳破坏理论分析[D].成都:西南交通大学,2009:15-34 Chen X Q. Theoretical analysis of the fatigue damage of contact wire[D]. Chengdu:Southwest Jiaotong University, 2009:15-34(in Chinese)
|
[9]
|
熊峻江.疲劳断裂可靠性工程学[M].北京:国防工业出版社,2008:16-22 Xiang J J. Fatigue fracture reliability engineering[M]. Beijing:National Defense Industry Press, 2008:16-22(in Chinese)
|
[10]
|
陈传尧.疲劳与断裂[M].武汉:华中科技大学出版社,2002:23-35 Chen C Y. Fatigue and fracture[M]. Wuhan:Huazhong University of Science and Technology Press, 2002:23-35(in Chinese)
|
[11]
|
卢伟,强士中,蒋永林.斜拉索抖振疲劳可靠度分析[J].中国公路学报,2001,14(4):63-66 Lu W, Qiang S Z, Jiang Y L. Buffeting fatigue reliability analysis of cable-stayed bridge[J]. China Journal of Highway and Transport, 2001,14(4):63-66(in Chinese)
|
[12]
|
周希沅.国产材料疲劳寿命分布参数α的初步估计[J].航空学报,1990,11(10):B488-B491 Zhou X Y. Preliminary estimation of the shape parameters of fatigue life distribution for home-made materials[J]. Acta Aeronautica et Astronautica Sinica, 1990,11(10):B488-B491(in Chinese)
|
[13]
|
杨靓.悬索桥吊索寿命期内动态可靠性分析[D].长沙:湖南大学,2009:63-71 Yang L. Research on time-varying reliability of suspension bridge hanger in a whole-life period[D]. Changsha:Hunan University, 2009:63-71(in Chinese)
|
[14]
|
刘怡,张卫华,梅桂明.受电弓/接触网垂向耦合运动中接触网动应力研究[J].铁道学报,2003,25(4):23-26 Liu Y, Zhang W H, Mei G M. Study of dynamic stress of the catenary in the pantograph/catenary vertical coupling movement[J]. Journal of the China Railway Society, 2003,25(4):23-26(in Chinese)
|
[15]
|
张卫华,沈志云.接触网动态研究[J].铁道学报, 1991,13(4):26-33 Zhang W H, Shen Z Y. Dynamic studies on catenary[J]. Journal of the China Railway Society, 1991,13(4):26-33(in Chinese)
|
[16]
|
梅桂明.受电弓-接触网系统动力学研究[D].成都:西南交通大学,2010:31-89 Mei G M. The dynamic study of pantograph/catenary system[D]. Chengdu:Southwest Jiaotong University, 2010:31-89(in Chinese)
|
[17]
|
李丰良,孙焰.TSG3受电弓的力学模型及运动微分方程[J].铁道学报,1998,20(6):119-121 Li F L, Sun Y. Mechanical models and differential equation of motion for TSG3 pantograph[J]. Journal of the China Railway Society, 1998,20(6):119-121(in Chinese)
|
[18]
|
吴燕,吴俊勇,郑积浩.高速弓网系统动态振动性能的仿真研究[J].铁道学报,2009,31(5):113-117 Wu Y, Wu J Y, Zheng J H. Simulation of dynamic behavior of high-speed pantograph-catenary system[J]. Journal of the China Railway Society, 2009,31(5):113-117(in Chinese)
|
[19]
|
Levy S, Bain J A, Leclerc E J. Railway overhead contact systems, catenary-pantograph dynamics for power collection at high speeds[J]. Journal of Engineering for Industry, 1968,90(4):692-699
|
[20]
|
Zhang W H, Mei G M, Wu X J, et al. A study on dynamic behaviour of pantographs by using hybrid simulation method[J]. Proceedings of the Institution of Mechanical Engineers, Part F:Journal of Rail and Rapid Transit, 2005,219(F3):189-199
|
[21]
|
Zhai W M, Cai C B. Effect of locomotive vibrations on pantograph-catenary system dynamics[J]. Vehicle System Dynamics:International Journal of Vehicle Mechanics and Mobility, 1998,29(S1):47-58
|
[22]
|
Dahlberg T. Moving force on an axially loaded beam-with applications to a railway overhead contact wire[J]. Vehicle System Dynamics:International Journal of Vehicle Mechanics and Mobility, 2006,44(8):631-644
|
[23]
|
李廉琨.结构力学[M].北京:高等教育出版社,1996:21-32 Li L K. structural mechanics[M]. Beijing:Higher Education Press, 1996:21-32(in Chinese)
|
[24]
|
田军,李强.改进的雨流法实时计数模型[J].北京交通大学学报,2009,33(1):28-31 Tian J, Li Q. Improved model of rain-flow real-time counting method[J]. Journal of Beijing Jiaotong University, 2009,33(1):28-31(in Chinese)
|