[1]
|
钱七虎,李朝甫,傅德明.全断面掘进机在中国地下工程中的应用现状及前景展望[J].建筑机械,2002,(5):28-35 Qian Q H, Li Z F, Fu D M. Application situation and outlook of TBM in underground project in China[J]. Construction Machinery, 2002,(5):28-25(in Chinese)
|
[2]
|
张厚美.TBM的掘进性能数值仿真研究[J].隧道建设,2007,26(S2):1-7 Zhang H M. Study on numerical simulations of performance of tunnel boring machines (TBM)[J]. Tunnel Construction, 2007,26(S2):1-7(in Chinese)
|
[3]
|
朱合华,徐前卫,廖少明,等.土压平衡盾构施工的顶进推力模型试验研究[J].岩土力学,2007,28(8):1587-1594 Zhu H H, Xu Q W, Liao S M, et al. Experimental study on thrust force during tunnel excavation with earth pressure balance shield machine[J]. Rock and Soil Mechanics, 2007,28(8):1587-1594(in Chinese)
|
[4]
|
吕强,傅德明.土压平衡盾构掘进机刀盘扭矩模拟试验研究[J].岩石力学与工程学报,2006,25(S1):3137-3143 Lü Q, Fu D M. Research on torque of cutterhead for earth pressure balance shield with simulating experimental[J]. Chinese Journal of Rock Mechanics and Engineering, 2006,25(S1):3137-3143(in Chinese)
|
[5]
|
桑松龄.TBM刀盘支撑筋布置优化[J].机械工程与自动化,2013,(6):13-15 Sang S L. Optimal design of support bar location of TBM cutter head[J]. Mechanical Engineering & Automation, 2013,(6):13-15(in Chinese)
|
[6]
|
吴峰.TBM盘形滚刀贯入度与结构参数优化设计研究[D].长沙:中南大学,2012 Wu F. TBM disc cutter penetration and structure parameter optimization design research[D]. Changsha:Central South University, 2012(in Chinese)
|
[7]
|
张珂,王腾跃,孙红,等.全断面岩石掘进机盘形滚刀破岩模拟[J].沈阳建筑大学学报(自然科学版),2010,26(6):1209-1213,1218 Zhang K, Wang T y, Sun H, et al. Simulation study on disc cutter of full face rock tunnel boring machine[J]. Journal of Shenyang Jianzhu University (Natural Science), 2010, 26(6):1209-1213,1218(in Chinese)
|
[8]
|
李大平.基于ABAQUS的TBM刀盘溜碴过程仿真[J].建设机械技术与管理,2013,(6):101-106 Li T P. Process simulation of the TBM knife disc slip to be based on ABAQUS[J]. Construction Machinery Technology & Management, 2013,(6):101-106(in Chinese)
|
[9]
|
夏毅敏,吴元,吴峰,等.某隧道盾构刀盘仿真与力学性能研究[J].计算机工程与应用,2013,49(11):248-251 Xia Y M, Wu Y, Wu F, et al. Study on simulation and mechanical properties of tunnel shield cutterhead[J]. Computer Engineering and Applications, 2013,49(11):248-251(in Chinese)
|
[10]
|
杨海栗,田建平,文华斌,等.基于ANSYS的全断面岩石隧道掘进机刀盘热-结构耦合分析[J].矿山机械,2013,41(4):11-14 Yang H L, Tian J P, Wen H B, et al. Thermal structure coupling analysis on cutterhead of full face rock TBM based on ANSYS[J]. Mining & Processing Equipment, 2013,41(4):11-14(in Chinese)
|
[11]
|
张红星,张宁川.803E掘进机刀盘振动问题浅探[J].隧道建设,2007,27(6):76-78 Zhang H X, Zhang N C. Brief discussion on cutter head vibration of type 803E TBM[J]. Tunnel Construction, 2007, 27(6):76-78(in Chinese)
|
[12]
|
刘义,李济顺,陈国定,等.盾构刀盘的有限元仿真分析研究[J].矿山机械,2008,36(17):31-33 Liu Y, Li J S, Chen G D, et al. Finite element simulation analysis on the shield cutterhead[J]. Mining & Processing Equipment, 2008,36(17):31-33(in Chinese)
|
[13]
|
张学亮.齿轮箱模态分析和结构优化方法研究[D].太原:太原理工大学,2010 Zhang X L. Study on modal analysis structure optimization method of gearbox[D]. Taiyuan:Taiyuan University of Technology, 2010(in Chinese)
|