[1]
|
Hong D S,Cho H S.Generation of robotic assembly sequenceswith consideration of line balancing using simulated annealing[J]. Robotica,1997,15(6):663~673
|
[2]
|
张刚等.基于知识的装配序列规划方法研究[J]. 机械科学与技术,2006,25(3):273~276
|
[3]
|
Tseng H E,Li J D,Chang Y H.Connector-based approach toassembly planning using genetic algorithms[J]. InternationalJournal of Production Research,2004,42(11):2243~2261
|
[4]
|
De Fazio T L,Whitney D E.Simplified generation of all mechan-ical assembly sequence[J]. IEEE Journal of Robotics andAutomations,1987,3(6):640~658
|
[5]
|
Gottipolu R B,Ghosh K.Representation and selection of assem-bly sequences in computer-aided assembly process planning[J]. International Journal of Production Research,1997,35(12):3447~3465
|
[6]
|
Tseng H E.Guided genetic algorithms for solving the larger con-straint assembly problem[J]. International Journal of Produc-tion Research,2006,44(3):601~625
|
[7]
|
王敬品等.基于遗传算法的装配序列规划[J]. 机械工程与自动化,2008,143(2):9~11
|
[8]
|
周开俊,李东波,潘洋宇.基于遗传退火算法的复杂产品装配序列规划方法[J]. 机械科学与技术,2006,25(3):277~280
|
[9]
|
史士财等.基于改进蚁群算法的装配序列规划[J]. 计算机集成制造系统,2010,16(6):1189~1994
|
[10]
|
Tseng H E,et al.Using memetic algorithms with guided localsearch to solve assembly sequence planning[J]. Expert Sys-tems with Applications,2007,33(2):451~467
|
[11]
|
Liang G,et al.Application of memetical gorithm in assembly se-quence planning[J]. The International Journal of AdvancedManufacturing Technology,2010,49(9~12):1175~1184
|
[12]
|
Chang C C,Tseng H E.Ling P M.Artificial immune systems forassembly sequence planning exploration[J]. Engineering Ap-plications of Artificial Intelligence,2009,22(8):1218~1232
|
[13]
|
于宏,王成恩,于嘉鹏等.基于粒子群算法的复杂产品装配序列规划[J]. 东北大学学报(自然科学版),2010,31(2):81~84
|
[14]
|
Birbil S I,Fang S C.An electromagnetism-like mechanism forglobal optimization[J]. Journal of Global Optimization,2003,25(3):263~282
|
[15]
|
Wu Q,Zhang C J,Gao L,Li X Y.Training neural networks byelectromagnetism-like mechanism algorithm for tourism arrivalsforecasting[A]. The IEEE Fifth International Conference onBio-Inspired Computing:Theories and Applications[C],2010,9:679~688
|
[16]
|
Alkin Y,Erdal E.A new hybrid electromagnetism-like algorithmfor capacitated vehicle[J]. Expert Systems with Applications,2010,37(4):3427~3433
|
[17]
|
Naderi B,Tavakkoli-Moghaddam R,Khalili M.Electromagnet-ism-like mechanism and simulated annealing algorithms for flowshop scheduling problems minimizing the total weighted tardinessand makespan[J]. Knowledge-based Systems,2010,23(2):77~85
|
[18]
|
Yuan K,Henequin S,Wang X J,Gao L.A new heuristic-EM forpermutation flow shop scheduling[A]. Proceedings of the 12thIFAC Symposium on Information Control Problems in Man-ufacturing[C],2006
|