留言板

尊敬的读者、作者、审稿人, 关于本刊的投稿、审稿、编辑和出版的任何问题, 您可以本页添加留言。我们将尽快给您答复。谢谢您的支持!

姓名
邮箱
手机号码
标题
留言内容
验证码

考虑柔性分批的IPPS问题研究

巴黎 李言 杨明顺 刘永

巴黎, 李言, 杨明顺, 刘永. 考虑柔性分批的IPPS问题研究[J]. 机械科学与技术, 2017, 36(3): 426-435. doi: 10.13433/j.cnki.1003-8728.2017.0317
引用本文: 巴黎, 李言, 杨明顺, 刘永. 考虑柔性分批的IPPS问题研究[J]. 机械科学与技术, 2017, 36(3): 426-435. doi: 10.13433/j.cnki.1003-8728.2017.0317
Ba Li, Li Yan, Yang Mingshun, Liu Yong. Investigating Integrated Process Planning and Scheduling Problem with Flexible Batch Splitting Considered[J]. Mechanical Science and Technology for Aerospace Engineering, 2017, 36(3): 426-435. doi: 10.13433/j.cnki.1003-8728.2017.0317
Citation: Ba Li, Li Yan, Yang Mingshun, Liu Yong. Investigating Integrated Process Planning and Scheduling Problem with Flexible Batch Splitting Considered[J]. Mechanical Science and Technology for Aerospace Engineering, 2017, 36(3): 426-435. doi: 10.13433/j.cnki.1003-8728.2017.0317

考虑柔性分批的IPPS问题研究

doi: 10.13433/j.cnki.1003-8728.2017.0317
基金项目: 

国家自然科学基金项目(61402361)、陕西省教育厅科学研究计划项目(14JK1521)、陕西省科学技术研究发展计划项目(科技新星)(2012KJXX-34)及西安理工大学青年科技创新团队建设计划项目(102-211408)资助

详细信息
    作者简介:

    巴黎(1986-),博士研究生,研究方向为生产计划与调度,xautbali@163.com

    通讯作者:

    李言(联系人),教授,博士生导师,jyxy-ly@xaut.edu.cn

Investigating Integrated Process Planning and Scheduling Problem with Flexible Batch Splitting Considered

  • 摘要: 工艺规划与调度是制造系统的两个重要组成环节,二者的集成是制造系统发展的关键技术之一。针对工艺规划与调度集成问题在批量方面考虑的不足,考虑将批量划分问题集成到工艺规划与调度集成问题中。为避免等批分批可能导致调度过程中生产能力与负载不均衡,采用柔性分批策略。同时考虑准备时间和加工时间,以最大完工时间最小为目标,对该问题进行建模。针对该问题,提出一种粒子群算法进行求解。最后,以实例验证了该数学模型的正确性及算法的有效性。
  • [1] 吕盛坪,乔立红.工艺规划与车间调度及两者集成的研究现状和发展趋势[J].计算机集成制造系统,2014,20(2):290-300 Lv S P, Qiao L H. Current status and developing trend of process planning and Job Shop scheduling[J]. Computer Integrated Manufacturing Systems, 2014,20(2):290-300(in Chinese)
    [2] 高亮,李新宇.工艺规划与车间调度集成研究现状及进展[J].中国机械工程,2011,22(8):1001-1007 Gao L, Li X Y. Current researches on integrated process planning and scheduling[J]. China Mechanical Engineering, 2011,22(8):1001-1007(in Chinese)
    [3] Li X Y, Zhang C Y, Gao L, et al. An agent-based approach for integrated process planning and scheduling[J]. Expert Systems with Applications, 2010,37(2):1256-1264
    [4] Li X Y, Gao L, Shao X Y, et al. Mathematical modeling and evolutionary algorithm-based approach for integrated process planning and scheduling[J]. Computers & Operations Research, 2010,37(4):656-667
    [5] Li X Y, Gao L, Shao X Y. An active learning genetic algorithm for integrated process planning and scheduling[J]. Expert Systems with Applications, 2012,39(8):6683-6691
    [6] 吕盛坪,乔立红.工艺规划与车间调度复合式集成模型[J].计算机集成制造系统,2014,20(1):110-120 Lv S P, Qiao L H. Hybrid integration model for process planning and scheduling[J]. Computer Integrated Manufacturing Systems, 2014,20(1):110-120(in Chinese)
    [7] Phanden R K, Jain A, Verma R. An approach for Integration of process planning and scheduling[J]. International Journal of Computer Integrated Manufacturing, 2013,26(4):284-302
    [8] Seker A, Erol S, Botsali R. A neuro-fuzzy model for a new hybrid integrated process planning and scheduling system[J]. Expert Systems with Applications, 2013,40(13):5341-5351
    [9] Guo Y W, Li W D, Mileham A R, et al. Applications of particle swarm optimisation in integrated process planning and scheduling[J]. Robotics and Computer-Integrated Manufacturing, 2009,25(2):280-288
    [10] Shao X Y, Li X Y, Gao L, et al. Integration of process planning and scheduling-a modified genetic algorithm-based approach[J]. Computers & Operations Research, 2009,36(6):2082-2096
    [11] 王万良,范丽霞,徐新黎,等.多目标差分进化算法求解柔性作业车间批量调度问题[J].计算机集成制造系统,2013,19(10):2481-2492 Wang W L, Fan L X, Xu X L, et al. Multi-objective differential evolution algorithm for flexible job-shop batch scheduling problem[J]. Computer Integrated Manufacturing Systems, 2013,19(10):2481-2492(in Chinese)
    [12] 曾强,杨育,王勇智,等.复合工艺流程下批量生产车间调度多目标优化[J].中国机械工程,2011,22(2):190-196 Zeng Q, Yang Y, Wang Y Z, et al. Multi-objective optimization scheduling for job shop of batch production with multiple process flows[J]. China Mechanical Engineering, 2011,22(2):190-196(in Chinese)
    [13] 曾强,杨育,沈玲,等.基于准时交货的批量生产FJSP多目标优化[J].计算机集成制造系统,2011,17(8):1780-1789 Zeng Q, Yang Y, Shen L, et al. Multiobjective optimization for batch production FJSP based on just in time delivery[J]. Computer Integrated Manufacturing Systems, 2011,17(8):1780-1789(in Chinese)
    [14] 王海燕,赵燕伟,王万良,等.两级差分进化算法求解多资源作业车间批量调度问题[J].控制与决策,2010,25(11):1635-1644 Wang H Y, Zhao Y W, Wang W L, et al. New parallel algorithm based on DE for batch splitting job shop scheduling under multiple-resource constraints[J]. Control and Decision, 2010,25(11):1635-1644(in Chinese)
    [15] 张静,王万良,徐新黎,等.基于改进粒子群算法求解柔性作业车间批量调度问题[J].控制与决策,2012,27(4):513-518 Zhang J, Wang W L, Xu X L, et al. Improved particle swarm algorithm for batch splitting flexible job shop scheduling[J]. Control and Decision, 2012,27(4):513-518(in Chinese)
    [16] 桑红燕,高亮,李新宇.求解批量流水线调度问题的离散蜂群算法[J].中国机械工程,2011,22(18):2195-2202 Sang H Y, Gao L, Li X Y. A discrete artificial bee colony algorithm for lot-streaming flow shop scheduling problem[J]. China Mechanical Engineering, 2011,22(18):2195-2202(in Chinese)
    [17] 王海燕,赵燕伟,张景玲,等.基于混合差分进化的混排Flow-shop分批优化调度[J].计算机集成制造系统,2013,19(7):1613-1625 Wang H Y, Zhao Y W, Zhang J L, et al. Batch optimized scheduling of intermingling flow-shop based on hybrid differential evolution algorithm[J]. Computer Integrated Manufacturing Systems, 2013,19(7):1613-1625(in Chinese)
    [18] 宋代立,张洁.蚁群算法求解混合流水车间分批调度问题[J].计算机集成制造系统,2013,19(7):1640-1647 Song D L, Zhang J. Batch scheduling problem of hybrid flow shop based on ant colony algorithm[J]. Computer Integrated Manufacturing Systems, 2013,19(7):1640-1647(in Chinese)
    [19] 马丁,陈庆新,毛宁,等.具有交货期约束带准备时间的平行机分批调度[J].计算机集成制造系统,2012,18(1):111-117 Ma D, Chen Q X, Mao N, et al. Parallel machine batch scheduling for due date constraints and setup time[J]. Computer Integrated Manufacturing Systems, 2012,18(1):111-117(in Chinese)
    [20] Sereshti N, Bijari M. Profit maximization in simultaneous lot-sizing and scheduling problem[J]. Applied Mathematical Modelling, 2013,37(23):9516-9523
    [21] Ramezanian R, Saidi-Mehrabad M, Fattahi P. MIP formulation and heuristics for multi-stage capacitated lot-sizing and scheduling problem with availability constraints[J]. Journal of Manufacturing Systems, 2013,32(2):392-401
    [22] Karimi-Nasab M, Seyedhoseini S M. Multi-level lot sizing and job shop scheduling with compressible process times:a cutting plane approach[J]. European Journal of Operational Research, 2013,231(3):598-616
    [23] Seeanner F, Almada-Lobo B, Meyr H. Combining the principles of variable neighborhood decomposition search and the fix & optimize heuristic to solve multi-level lot-sizing and scheduling problems[J]. Computers & Operations Research, 2013,40(1):303-317
    [24] Noroozi A, Mokhtari H, Abadi I N K. Research on computational intelligence algorithms with adaptive learning approach for scheduling problems with batch processing machines[J]. Neurocomputing, 2013,101:190-203
  • 加载中
计量
  • 文章访问数:  156
  • HTML全文浏览量:  18
  • PDF下载量:  5
  • 被引次数: 0
出版历程
  • 收稿日期:  2015-08-18
  • 刊出日期:  2017-03-05

目录

    /

    返回文章
    返回