Remanufacturing Assessment of Typical Mining Waste Parts Based on Remaining Life Prediction Model
-
摘要: 废旧矿冶零部件正成为全世界增长最快的废弃物,对其分类评估决策是再制造循环利用的前提和基础.根据废旧零部件灰尘多、腐蚀大、磨损快的特殊工况可靠性阈值及再制造经济性,建立典型矿冶废旧零部件剩余寿命的预测模型,通过构建基于霍尔三维结构的再制造评估方法,可以为企业废旧零部件残余寿命准确预测与再制造性评估决策提供一种新的解决途径.以电动轮自卸车曲轴为例,验证了上述方法的可行性.Abstract: Mining Waste Parts are becoming the world's fastest growing components of the waste; the classification and estimation are the basis of remanufacturing recycling. According to the reliability threshold and remanufacturing economy in the special conditions of dusty,corrosion and fast wear,the typical mining waste parts remaining life prediction model is established; by building remanufacturing estimation method based on three dimensional structure of the Hall,a new solution for enterprise to accurately predict the residual life of waste parts and the remanufacturing decision making are provided. The crankshaft of the electric wheel dump truck is taken as an example to illustrate the feasibility of the idea.
-
Key words:
- cost benefit analysis /
- decision making /
- estimation /
- fatigue of materials
-
[1] 张伟,徐滨士,张纤,等再制造研究应用现状及发展 策略[J]装甲兵工程学院学报,2009,23(5);1-5 ZhangW,Xu B S,Zhang S,et al.Status and developing of remanufactauring research and application[J] Armored Force Engineering Institute,2009,23(5):1-5 (in Chinese) [2] Tangirala R A.Stochastic modeling of fatigue crack dynamic、for on line failure prognostic、[J]IEEE Transactaion Son Control system Technology,1996,4(4): 443-451 [3] 申中杰,陈雪峰,何正嘉,等基于相对特征和多变量 支持向量机的滚动轴承剩余寿命预测[J]机械工程 学报, 2013,49(2):183-189 Shen Z J,Chen X F,He Z J,et al.Remaining life predictaions of rolling bearing based on relative features and multivariable support vectaor machine [J].Journal of Mechanical Engineering,2013,49(2):183-189(in Chinese) [4] 曾寿金,江吉彬,许明三机电产品再制造特性评价模 型研究[J]福建工程学院学报,2009,7(3);271-274 Zhen S J,Jiang J B,Xu M S.Research on assessment model of electaromechanical productas remanufactauring[J] Journal of Fujian University of Technology,2009,7(3): 271-274(in Chinese) [5] 杜彦斌,曹华军,刘飞,等基于嫡权与层次分析法的 机床再制造方案综合评价[J]计算机集成制造系统, 2011,17(1):84-88 DuYB,Cao H J,Liu F,et al.Evaluation of machine tool remanufactauring scheme based on entropy weight and AHP[J]Computer Integrated Manufactauring Systems,2011,17(1);84-88 [6] 谭源源,张春华,陈循,等基于加速寿命试验的剩余 寿命评估方法[J]机械工程学报,2010,46(2):150-154Tan Y Y,Zhang C H,Chen X,et al.Remaining life evaluation based on accelerated life testing [J].Journal of Mechanical Engineering,2010,46(2):150-154(in Chinese) [7] 张旭刚,张华,江志刚基于剩余使用寿命评估的再制 造方案决策模型及应用[J]机械工程学报,2013,49 (7);51-57 Zhang X G,Zhang H,Jiang Z G.Remanufactauring scheme decision model and application based on remaining useful life estimation[J]Journal of Mechanical Engineering,2013,49(7):51-57(in Chinese) [8] Engel S J,Gilmartin B J,Bongort K,et al Prognosticta,the real issues involved with predictaing life remaining[C]//Proceedings of IEEE Aerospace Conference,Big Sky,MT,USA:IEEE,2000 [457-469 [9] 劳利期寿命数据中统计模型与方法[M]茹诗松,译 北京:中国统计出版社,1998 Law Less.Life data in statistical models and methods[M] Mao S S,translator.Beijing;China Statistic、Press,1998 (in Chinese) [10] 徐微,胡伟明,孙鹏基于两参数威布尔分布的设备寿 命可靠性预测研究[J]中国工程机械学报,2013,11 (2):112-116 XuW,Hu WM,Sun P.Equipment reliability predictaion based on dual-parametric weibull distribution[J] Chinese Journal of Constructaion Machinery,2013,11 (2):112-116(in Chinese) [11] Vapnik V N统计学习理论的本质[M]北京:清华大 学出版社,2000 Vapnik V N.The nature of statistical theory[M] Beijing;Tsinghua University Press,2000(in Chinese) [12] 汪应洛系统工程[M]北京:机械工业出版社,2009 Wang Y 1.Systems engineering[M].Beijing; Machinery Industry Press,2009(in Chinese) [13] 于立君工程经济学[M]北京:机械工业出版社, 2010 Yu L J.Engineering economict、[M]Beijing ; Machinery Industry Press,2010(in Chinese) [14] 王华胜,李忠厚,郭金福,等内燃机车寿命周期费用 模型与分析[J]内燃机,2007,(9): 8-13 WangHS,LiZH,Guo J F,et al.Locomotives and life cyctae cost analysis model[J].Diesel Locomotive,2007 (9[:8-13(in Chinese) [15] 武建伟,江伟光,潘双夏面向产品生命周期的集成模 型及演化研究[J]计算机集成制造系统,2009,18 (8):1493-1499 WuJW,JiangWG,Pan S G.Integration model and its evolution for producta lifecyctae[J]Computer Integrated Manufactauring Systems,2009,18(8):1493-1499(in Chinese) [16] 刘志峰,毕道坤,刘涛基于线性回归模型的机电产品 再制造费用预测[J]机械设计与制造,2011,(9): 258-260 Liu Z F,Bi D K,Liu T.Estimating for remanufactauring cost of mechanical and electarical productas based on linear regression[J]Machinery Design and Manufactaure,2011,(9):258-260(in Chinese) [17] 王翔48MnV退役曲轴剩余疲劳寿命测评技术研究[D] 上海:上海交通大学,2011 Wang X.Investigation on the residual fatigue life evaluation of 48MnV crankshaft core[D]Shanghai: Shanghai Jiaotong University,2011(in Chinese) [18] 郝英基于智能技术的民航发动机故障诊断和寿命预 测研究[D]南京:南京航空航天,2006 Hao Y.Based on intelligent technology in aviation engine fault diagnosis and life predictaion[D [.Nanjing ; Nanjing Aeronautic、and Astronautic、,2006(in Chinese) [19] 史峰,王小川,郁磊,等MATLAB神经网络30个案例 分析[M]北京:北京航空航天大学出版社,2010 Shi F,Wang X C,Yu Lei,et al.MATLAB neural network analysis of 30 cases[M]Beijing; Beijing University of Aeronautic、and Astronautic、Press,2010 (in Chinese) [20] 刘韶光汽车曲轴再制造评价技术研究[D]武汉:武 汉理工大学,2010 Liu S G.Evaluation techniques research on remanufactaured automotive crankshaft[D]Wuhan: Wuhan University of Technology,2010(in Chinese) [21] 赖霞虹产品再制造拆卸规划方法与零件再制造评估 方法的研究[D]杭州:浙江大学,2012 Lai X H.Remanufactauring disassembly sequence plan of productas and the assessment of remanufactauring property of parts[D]Hangzhou:Zhejiang University,2012(in Chinese)
点击查看大图
计量
- 文章访问数: 174
- HTML全文浏览量: 29
- PDF下载量: 6
- 被引次数: 0