Articles:2024,Vol:29,Issue(1):47-53
Citation:
PANG Zhining, XU Tianyi, WU Xusheng, JIN Wenxin. Research on Visual Operation and Guide System of Railway Four-electric Engineering Construction[J]. International Journal of Plant Engineering and Management, 2024, 29(1): 47-53

Research on Visual Operation and Guide System of Railway Four-electric Engineering Construction
PANG Zhining, XU Tianyi, WU Xusheng, JIN Wenxin
Design & Research Institute, China Railway Electrification Bureau(Group) Co., Ltd., Beijing 100166, China
Abstract:
The visualization operation of railway four-electric engineering construction is an important part in railway's construction, which plays a critical role in improving operation efficiency and it is smoothly finished on railway four-electric majors' professional construction. According to the typical high-speed railway project construction's technology, these four-electric professional construction's technology scheme are made into construction method's video, according to the technology plan's characteristics of professional, visualization and information, under the premise of improving the efficiency about professional project management and construction of the railway four-electric project, the critical technology problems of railway four-electric project are solved. At the same time, it also improves efficiency of BIM model's construction, the cooperation management's efficiency of construction process, and the ability of integrating model information.
Key words:    four electric    platform    BIM    railway    process method   
Received: 2023-11-17     Revised:
DOI: 10.13434/j.cnki.1007-4546.2024.0104
Corresponding author:     Email:
Author description:
Service
PDF(3618KB) Free
Print
Authors
PANG Zhining
XU Tianyi
WU Xusheng
JIN Wenxin

References:
[1] WANG X L, WANG X G, CHEN X, et al. Research on the integrated application of bim in high-speed railway construction and operation management[J]. Railway Standard Design, 2023, 67(10): 186-193. (in Chinese)
[2] GUO J, MA C X, et al. Current status challenges and architecture of digital quality, management for high-speed railway engineering[J]. High Speed Railway Technology, 2023, 14(4): 25-29. (in Chinese)
[3] China National Railway Group Limited. Technical guideline for intelligent construction of railway traction power supply and electric power engineering: Q/CR 9257-2023[S]. Beijing: China Railway Publishing House. (in Chinese)
[4] PANG Z N, et al. Research on BIM/CAE/CAM catenary ratchet's digital design, verification and manufacturing technology[J]. Chinese Journal of Electrical Engineering, 43-44. (in Chinese)