Articles:2021,Vol:26,Issue(3):129-149
Citation:
DU Jingyu, LI Jianping, HU Yimfun, GUAN Xin, SI Min, LIU Bin. Maintenance Scheduling with Delay-time Modelling: An Overview[J]. International Journal of Plant Engineering and Management, 2021, 26(3): 129-149

Maintenance Scheduling with Delay-time Modelling: An Overview
DU Jingyu1, LI Jianping1, HU Yimfun1, GUAN Xin2, SI Min2, LIU Bin2
1. Faculty of Engineering and Informatics, University of Bradford, Bradford, UK;
2. School of Electrical Engineering, Shenyang University of Technology, Shenyang 110870, China
Abstract:
Effective maintenance is a key for infrastructures' high operational reliability. The integration of corrective repairs and schedule-based failure preventions has been a mainstream of modern maintenance, and an associated policy-making technique, delay-time modelling, is overviewedin this paper for optimising the maintenance cost-efficiency in different practical scenarios, including imperfect, opportunistic and nested maintenance. A few typical examples of its applications in minimising maintenance operating expenses are discussed in this paper and their results are explained to better demonstrate the benefits of the technique. This work aims to prepare for the future applications of the delay-time modelling in railway maintenance policy making.
Key words:    maintenance    failure prevention    delay-time modelling    cost minimisation   
Received: 2021-03-19     Revised:
DOI: 10.13434/j.cnki.1007-4546.2021.0301
Corresponding author:     Email:
Author description:
Service
PDF(340KB) Free
Print
Authors
DU Jingyu
LI Jianping
HU Yimfun
GUAN Xin
SI Min
LIU Bin

References:
[1] O'CONNOR P D T, KLEYNER A. Practical reliability engineering[M]. 5th ed, United Kingdom:John Wiley and Sons, 2012
[2] GARLAND D J, STAINER F W. Modern electronic maintenance principles[M]. 1st ed, Oxford:Pergamon, 1970
[3] GEITNER F K, BLOCH H P. Maximizing machinery uptime[M]. Oxford:Elsevier, 2006
[4] FRIEDMAN M A, TRAN P Y, GODDARD P L. Reliability of software intensive systems[M]. Park Ridge:Williarm Andrew, 1995
[5] CHOWDHURY A A, KOVAL D O. Power distribution system reliability:practical methods and applications[M]. United Kingdom:Wiley-IEEE Press, 2009
[6] TAGHIPOUR S, BANJEVIC D, JARDINE A K S. Reliability analysis of maintenance data for complex medical devices[J]. Quality and Reliability Engineering International, 2011,27:71-84
[7] FLAGE R. A delay time model with imperfect and failure-inducing inspections[J]. Reliability Engineering and System Safety, 2014,124:1-12
[8] MUN J. Appendix c understanding and choosing the right probability distributions[J]. Advanced Analytical Models, 2012:899-917
[9] XU J, XU L. Chapter eight-maintenance decision support[J]. Integrated System Health Management Perspectives on Systems Engineering Techniques, 2017:377-432
[10] BAI Y, JIN W L. Chapter 44-risk-centered maintenance[J]. Marine Structural Design, 2015:803-825
[11] YU W, ZHANG J, WEN K, et al. A novel methodology to update the reliability of the corroding natural gas pipeline by introducing the effects of failure data and corrective maintenance[J]. International Journal of Pressure Vessels and Piping, 2019,169:48-56
[12] AHMAD R, KAMARUDDIN S. An overview of time-based and condition-based maintenance in industrial application[J]. Computers & Industrial Engineering, 2012,63(1):135-149,
[13] CHRISTER A H, WALLER W M. Reducing production downtime using delay-time analysis[J]. The Journal of the Operational Research Society, 1984,35(6):499-512
[14] CHRISTER A H, WANG W, SHAR P J, et al. A case study of modelling preventive maintenance of a production plant using subjective data[J]. The Journal of the Operational Research Society, 1998,49(3):210-219
[15] CHRISTER A H, WANG W, BAKER R D, et al. Modelling maintenance practice of production plant using the delay-time concept[J]. IMA Journal of Management Mathematics, 1995,6(1):67-83
[16] BROWN R E. 4.2 Failure rates and bathtub curves[J]. Electric Power Distribution Reliability, 2008:165-167
[17] KEITH MOBLEY R. An introduction to predictive maintenance[J]. Butterworth-Heinemann, 2002
[18] LAGGOUNE R, CHATEAUNEUF A, AISSANI D. Impact of few failure data on the opportunistic replacement policy for multi-component systems[J]. Reliability Engineering & System Safety, 2010,95(2):108-119
[19] OLDE KEIZER M C, FLAPPER S D P, Teunter R H. Condition-based maintenance policies for systems with multiple dependent components:a review[J]. European Journal of Operational Research, 2017,261(2):405-420
[20] LYU X, LIU Q, LI Z, et al. A new maintenance optimization model based on three-stage time delay for series intelligent system with intermediate buffer[J]. Shock and Vibration, 2021,2021:1-19
[21] TODOSIJEVIĉ R, BENMANSOUR R, HANAFI S, et al. Artiba, nested general variable neighborhood search for the periodic maintenance problem[J]. European Journal of Operational Research, 2016,252:385-396
[22] WANG J, ZHOU Z, PENG H. Flexible decision models for a two-dimensional warranty policy with periodic preventive maintenance[J]. Reliability Engineering & System Safety, 2017,162:14-27
[23] CHUKOVA S, JOHNSTON M R. Two-dimensional warranty repair strategy based on minimal and complete repairs[J]. Mathematical and Computer Modelling, 2006,44(11-12):1133-1143
[24] BAKER R. Maintenance optimisation with the delay time model[J]. Reliability and Maintenance of Complex Systems, 1996:550-587
[25] SHANG H, BERENGUER C, ANDREWS J. Delayed maintenance modelling considering speed restriction for a railway section[J]. Journal of Risk and Reliability, 2015,231(4)
[26] WANG W. An overview of the recent advances in delay-time-based maintenance modelling[J]. Reliability Engineering and System Safety, 2012,106:165-178
[27] CAMPOS J. Development in the application of ICT in condition monitoring and maintenance[J]. Computers in Industry, 2009,60(1):1-20
[28] JARDINE A K S, LIN D, BANJEVIC D. A review on machinery diagnostics and prognostics implementing condition-based maintenance[J]. Mechanical Systems and Signal Processing, 2006,20(7):1483-1510
[29] NEALE M J. D11-Condition monitoring[J]. Tribology Handbook, 1996,D11.1-D11.4
[30] MAHON L L J. Maintenance[J]. Diesel Generator Handbook, 1992:609-621
[31] WANG W. Delay time modelling[J]. Complex System Maintenance Handbook, 2008:345-370
[32] SALAMEH J P, CAUET S, ETIEN E, et al. Gearbox condition monitoring in wind turbines:a review[J]. Mechanical Systems and Signal Processing, 2018,111:251-264
[33] HONDA M, KISHI T, YAMAMOTO H. Study of asset management method for galvanized steel railway electrification infrastructure in JR-EAST[J]. International Conference on Through-life Engineering Services, 2017,59:47-52
[34] CHRISTER A H. Innovative decision making[C]//Proceedings of NATO Conference on the Role of Effectiveness of Theory of Decision in Practice, 1976
[35] CHRISTER A H, WALLER W M. Delay time models of industrial inspection maintenance problems[J]. Journal of the Operational Research Society, 1984,35(5):401-406,
[36] CHRISTER A H, WANG W. A delay-time-based maintenance model of a multi-component system[J]. IMA Journal of Mathematics Applied in Business & Industry, 1995,6(2):205-222
[37] LIU G H, CHEN S K, JIN H, et al. Optimum imperfect inspection and maintenance scheduling model considering delay time theory[J]. Journal of Zhejiang University, 2020,54(7):1298-1307(in Chinese)
[38] SOUZA N M, ALMEIDA FILHO A T. A systematic airport runway maintenance and inspection policy based on a delay time modeling approach[J]. Automation in Construction, 2020,110:1-10
[39] SANTOS A C, CAVALCANTE C A, RIBEIRO L F. The use of second-hand items based on delay time modelling[J]. Process Safety and Environmental Protection, 2021,146:118-125
[40] WANG W. A model of multiple nested inspections at different intervals[J]. Computers & Operations Research, 2000,27:539-558
[41] WANG W. An inspection model for a process with two types of inspections and repairs[J]. Reliability Engineering and System Safety, 2009,94:526-533
[42] CUI L, LI H. Opportunistic maintenance for multi-component shock models[J]. Mathematical Methods of Operations Research, 2006,63:493-511
[43] MAO Z Y, SONG B W, PAN G, et al. Optimal system preventive maintenance model of different preventive maintenance period[J]. Fire Control & Command Control, 2010,35(3):58-60,74