Contents:2019,Vol:24,Issue(3):169-179
Citation:
CHEN Rui, WANG Yiping, SUN Tieyuan. Research of Maintenance Task Interval Optimization of Elevator Hydraulic Actuation System[J]. International Journal of Plant Engineering and Management, 2019, 24(3): 169-179

Research of Maintenance Task Interval Optimization of Elevator Hydraulic Actuation System
CHEN Rui, WANG Yiping, SUN Tieyuan
Shanghai Aircraft Customer Service Co., Ltd., Shanghai 200241, China
Abstract:
In order to solve the best maintenance interval problem of the elevator hydraulic actuation systems on civil aircraft, a method based on reliability and cost minimum is introduced in this paper. The estimation of system reliability is presented by using two-parameter Weibull distributions. The parameters are estimated by using Weibull probability statistical analysis and the practical operational data. Then, the maintenance optimization model isformulated where the objective function is to minimize the expected schedule maintenance cost in a time unit. The results of numerical example show that the proposed model could scheme the optimal maintenance intervals for the considered system when the parameters are given. This research has certain significance in theoryand engineering practice.
Key words:    elevator hydraulic actuation system    maintenance interval    minimum cost    Weibull   
Received: 2019-03-15     Revised:
DOI: 10.13434/j.cnki.1007-4546.2019.0304
Corresponding author:     Email:
Author description: CHEN Rui is a master, Shanghai Aircraft Custormer Service Co., Ltd. His research interest is flight control system logistic analysis. chenrui@comac.cc
WANG Yiping is a Ph.D, Shanghai Aircraft Custormer Service Co., Ltd. His research interest is fuel system logistic analysis. wangyiping@comac.cc
SUN Tieyuan is a master, Shanghai Aircraft Custormer Service Co., Ltd. His research interest is hydraulic system logistic analysis. suntieyuan@comac.cc
Service
PDF(1389KB) Free
Print
Authors
CHEN Rui
WANG Yiping
SUN Tieyuan

References:
[1] Pham H, Wang H Z. Imperfect maintenance[J]. European Journal of Operational Research, 1996, 94:425-438
[2] Kijima M. Some results for repairable systems with general repair[J]. Journal of Applied Probability, 1989, 26:89-102
[3] Guo R, Ascher H E, Love C E. Generalized models of repairable systems-A survey via stochastic processes formalism[J]. ORION,2000,16(2):87-128
[4] Liu X, Makis V, Jardine A K S. A replacement model with overhauls and repairs[J]. Naval Research Logistics,1995,42:1063-1079
[5] Nakagawa T. A summary of imperfect preventive maintenance policies with minimal repair[J]. RAIRO Operations Research,1980,14:249-255
[6] Nakagawa T. Periodic and sequential preventive maintenance policies[J]. Journal of Applied Probability, 1986, 23:536-542
[7] Lin D, Zuo M J, Yam R C M. General sequential imperfect_preventive maintenance models[J]. International Journal of Reliability Quality and Safety Engineering, 2000,7:253-266(in Chinese)
[8] Wang Z M, Yang J G, Wang G Q, et al. Sequential imperfect preventive maintenance policy with random maintenance quality under reliability limit[J].Proceedings of the Institution of Mechanical Engineering Science,2011,224(8):1926-1935(in Chinese)
[9] Han B J, Fan X M, Ma D Z. Research on the optimal preventive maintenance policy based onreliability constraints[J]. Chinese Journal of Mechanical Engineering, 2003, 39(6):102-105(in Chinese)
[10] Wang Y X, Yang H, Jia B H, et al. Research on the maintenance task intervaloptimization of civil aircraft hidden functionsystem based on Weibull distribution[J]. Hydromechatronics Engineering,2016,44(6):40-46(in Chinese)