Articles:2014,Vol:19,Issue(2):116-121
Citation:
XU Liang-xiong. The Electrical Control System PLC Transformation of The T68 Boring[J]. International Journal of Plant Engineering and Management, 2014, 19(2): 116-121

The Electrical Control System PLC Transformation of The T68 Boring
XU Liang-xiong
College of Electromechanical Engineering,Wuhan Technical College of Communications,Wuhan 430065, P.R. China
Abstract:
T68 boring machine electric control system circuit is complex,its reliability and flexibility is poor with high failure rate. The mitsubishi FX2N-40 MR Programmable controller for the technical innovation of electric control system improves the work performance of the whole electric control system and the work efficiency. This paper introduces the mitsubishi FX2N-40 MR PLC in T68 boring machine electric control system,the application of the elaborated system's hardware and PLC program design can provide work for technical reform of similar equipment.
Key words:    mitsubishi FX2N-48MR PLC    T68 boring machine electrical control system transformation   
Received: 2014-03-29     Revised:
DOI: 10.13434/j.cnki.1007-4546.2014.0208
Funds: The paper is supported by Hubei Province Education Science"Twelfth Five Year Plan"2013 Annual Research Topic, No.2013B298
Corresponding author:     Email:
Author description:
Service
PDF(716KB) Free
Print
Authors

References:
[1] Cui Q. PLC reform of T68 boring machine[J]. Mechanical & Electrical Technology,2010,(2):118-119 (in Chinese)
[2] Zhao M. Plant Eectrical Control Equipment [M]Beijing: Mechanical Industry Press,2007 (in Chinese)
[3] Miao Y N. Transformation T68 boring PLC electrical control system [J]. Light Industry Science and Technology,2012,(7):64-65(in Chinese)
[4] Liu H P. Mitsubishi FX2N series PLC refor-ming to T68 boring lathe [J]. Equipment Manufacturing Technology,2013,(2):37-38(in Chinese)
[5] Jia C S. Application of PLC in control of T68 type boring machine[J]. Science & Technology Information,2013,(7):105-106 (in Chi-nese)
[6] Wang X, Huang H. Reforming of electrical con-trol system of T68 boring machine with PLC[J].China Educational Technology & Equipment,2012, (6): 119-121 (in Chinese)
[7] Gao S X. The application of PLC in the T68 boring machine electric transformation[J]. In-formation & Communications,2011, (4):64-65 (in Chinese)
[8] Sun W H. The application of PLC in the T68 boring machine electric transformation[J]. Sil-icon Valley, 2011, (22):141 (in Chinese)
[9] Xu L X."Programmable controller"course"teaching to do integration"practice [J].Wuhan Vocational College, 2011, 13 (1):64-67 (in Chinese)