Articles:2012,Vol:17,Issue(2):95-103
Citation:
GENG Jun-bao, JIN Jia-shan, LUO Yun, WU Yi-liang. Development and Actuality of Life Cycle Cost Technique in China[J]. International Journal of Plant Engineering and Management, 2012, 17(2): 95-103

Development and Actuality of Life Cycle Cost Technique in China
GENG Jun-bao, JIN Jia-shan, LUO Yun, WU Yi-liang
College of Naval Architecture and Power,Naval University of Engineering,Wuhan 430033,P. R. China
Abstract:
Life cycle cost technique is a powerful tool to make a scientific decision and a useful method of advancing the continuable development of the society.In this paper,development course,application actuality and up-to-date research trends of life cycle cost technique in China are summarized.Some suggestions are given on how to generalize the application of life cycle cost technique,which are used as the reference to study life cycle cost technique.
Key words:    life cycle cost technique    development course    application actuality    up-to-date research trends   
Received: 2012-02-26     Revised:
DOI:
Funds: This paper is supported by the National Postdoctoral Science Foundation of P.R.China under Grant No.20080431380
Corresponding author:     Email:gengjb2002@163.com
Author description:
Service
PDF(528KB) Free
Print
Authors

References:
[1] Wang H S, Liu L Z,Wen L. et al,.LCCmodel and factors aualysis in motor trainu-nit. The Nine National Conference of LCC Committee of China Association of Plant Management,Shaihai,131-135,2010(In Chinese)
[2] Zhou H,Xie S C,Life cycle cost software in railway vehicle. Changsha Railway Academy,9 (4):222-223,2008 (In Chinese)
[3] Chen G,The Life-cycle cost and selection of ur-ban mass transit equipment. City Railway Traffic Research,(5):26-29,2003(In Chinese )
[4] Wen Q,Zhou Q H,UMT booking service say-tem in life cycle cost. City Railway Traffic Re-search (2):8-11,2007 (In Chinese)
[5] Yao Z G,Huang J D,Li Y Q,Occasional re-pair cost prediction of ships on radial network. China Ship Repair 21 (2):41-44,2008 (In Chinese)
[6] Wang W,Peng R H,}pplicatiou research on combiued.forecastiu} of the outlay of shipbuild-iug in batch. Ship Science and Technology 31 (3):124-127,2009 (In Chinese)
[7] Lin G M,Study of the Life and cost of military fleet during service period. Xi'an:Northwest-ern Polytechnical University 2005(In Chi-nese)
[8] Li Y P,Ni R,Application of LCC idea to 8737 aircraft reliability monitoring. Journal of Shanghai University of Engineering Sci-ence,23(1):90-94,2009 (In Chinese)
[9] Yu J W,Huang X M,Liao G Y,Life cycle cost aualysis of expressway maintenance work zone. Journal of Transportation Engineering and Information,8 (3):43-48,2010(In Chinese)
[10] Ma Q L,Study on durable asphalt pavement structure with rigid base. Xi'an:Chang'an University,2006 (In Chinese)
[11] Xiang G W,Lu D F,Life cycle cost analysis in amber high speed pavement design applica-tiou. China Water Transport,8(1):140-141,2008 In Chinese)
[12] Sang C,Zhang Y,Xu G,Analysis of Life cy-cle cost for asphalt pavement in permafrost zone. Journal of Nanjing University of Tech-Nology,29 (2):91-94,2007 (In Chinese)
[13] Liu L P,Hua X M,Quautitative aua加is of life-cycle costs composition for asphalt pave-meat. Central South Highway Engineering 30 (4):192-195,2005 (In Chinese)
[14] Yin K,Yu D S, Li L H,lpplicatiou of LCC to bidding-based purchase of 500 kV traus-formers. East China Electric Power,37 (5): 741-744,2009 (In Chinese)
[15] Jiang W J,Chen H H,Shi G Y, The Choice of main transformer of transformer station based on LCC model. Electric power and elec-trician,29(1):21-23,2009 (In Chinese)
[16] Cui X Q,Yin L B,Fan C J,et al,Study of LCC for Power transformer in modificatiou of traunsformer substation. Power System Protec-tion and Control 38 (7):69-73,2010(In Chinese)
}17} Liu J,Zhang Y,Du Z Y,Life cycle cost seu-sitivity aualysis in AC transmission Lines de-sign. High Voltage Engineering,36(6): 1554-1559,2010 (In Chinese)
}18} Yang Q Z,Life cycle cost control of daqiug oil field construction. Oil Field Engineering,28 (6):63-65,2009 (In Chinese)
}19} He Y B,Jin J S,Geng J B,Some cases of devices maintenance and material choice based on LCC in coal and medical plants. China Plant Engineering,(9 ):31-32,2008(In Chinese)
}20} Wu Y L,Discussion in application of LCC technique in green construction. China Plant Engineering:39-41,2008(In Chi-nese)
[21] Liu H,Zhang R,Li Z F, Life cycle cost-beue-fit anlysis of green building. Construction Management Modernization,103(6):50-52,2008 (In Chinese)
[22] Wang E M,Liu Y H,BaoXY,Research in auvestmeut decision based on the life-cycle cost of energy efficient residential buildings. Con-struction Economy (5):31-33,2010(In Chinese)
[23] Hao W,Chen J Z,The economic assessment research on bridge technical rebuilding based on life cycle cost. Journal of Lanzhou Jiaotong University,28 (3 ):25-28,2009(In Chi-nese)
[24] Gao Y, Fu L,Yan D,Comparison and selec-taou of HVAC schemes applying recyclingiug water, from power plants. HV&ACcnnl-
37 (1):52-54,2007 (In Chinese)
[25] Zhou Y C,Research of maintainability design of Air to air missile. Aviation Weapon,(1): 42-45,2004 (In Chinese)
[26] Yu J X,Zhao I,Gu P,Study on cost-effec-taveuess Aualysis method of Vessel. Ocean Technology,25(1):94-96,2006 (In Chi-nese)
[27] Wu H,Qing X D,Huang Y,Research on the Life cycle risk prediction of artillery weapons and equipment. Sci Tech Information Devel-opment&Economy,19 (4):172-174,2009 (In Chinese)
[28] Zhang H X,Guo J L,Li M,et al,Study on integrated cost-effectiveness characteristics of military aircraft. Aeronautic Transaction,26 (3):308-314,2005 (In Chinese)
[29] Zhang W,Hua X L,A method of estimating the LCC of ground radar equipment based on BP neural network. Journal of Air Force Engi-neering University,10(1):52-55,2009 (In Chinese)
[30] Zhang Y F,Luo Q G,Primary exploration of the integrated of power train system in armored vehicles. Journal of Academy of Armored Force Engineering,19 (2):64-69,2005 (In Chinese)
[31] Lu I},Li W J,Life cycle cost analysis of uuiu-habited combat air vehicles. Journal of North-western Polytechnical University,20(4): 663-667,2002 (In Chinese)
[32] Liang Q W,Song B W,Pan G,et al,The stndy method of life cycle cost of Torpedo. Fire Control and Command Control 30 (3):14-17,2005 (In Chinese)
[33] Liang Q W,Song B W,Jiang J,Fuzzygreyideal point method for estimating the Life cyclecost and effectiveness of torped. Systems Engi-neering and Electronics,28(9):1375-1377,2006 (In Chinese)
[34] Liang Q W,Song B W,Wu Z H,life cyclecost modeling of fuzzy principal componentmethod for weapon system. Journal of SystemSimulation,17(1):63-65,2005(In Chi-nese)
[35] Liang Q W,Song B W,WuZH,Data col-Lectaou and grey processing method of life cyclecost for torpedo. Computer Simulation,24(2):1-3,2007 (In Chinese)
[36] Guo J Z,Song G B,Peng S X,Aualysis foroperational and support cost of equipmentusing grey mode. Systems Engineering andElectronics,26(1):74-77,2004 (In Chi-nese)
[37] Cong Y,Modeling for the equipment LCC basedon principal components and SVM. Ship&Ocean Engineering 39 (4):165-167,2010(In Chinese)
[38] Sun L K,Study on the processing of the LCCimpact factors and the optimization of thebuilding model methods in the parameter esti-mate method. Wuhan:Naval University ofEngineering,2009 (In Chinese)
[39] Wang B,Guo B,Schema mapping optimiza-tiou of equipment Lifecycle data source. Com-puter Integrated Manufacturing Systems,15(5):1031-1040,2009 (In Chinese)
[40] Wu M,Wang C,Li J Y,Au aualysis on theuncertainty of weaponry's LCC estimation. De-fence Science and Technique,30(1):6-10,2009,In Chinese)