Articles:2013,Vol:18,Issue(3):159-164 |
|
|
Citation: |
|
|
JING Lian-tian, LIU Lang. Production Planning and Control of the Pipeline Assembly Enterprise under SCM[J]. International Journal of Plant Engineering and Management, 2013, 18(3): 159-164 |
|
|
|
|
|
|
|
Production Planning and Control of the Pipeline Assembly Enterprise under SCM |
|
JING Lian-tian, LIU Lang |
|
School of Management,Northwestern Polytechnical University,Xi'an 710072, P. R. China |
Abstract: |
It is vital for pipeline assembly enterprise to respond to changing market needs quickly and keep its cost advantage. A production planning and control( PPC) model under supply chain management combining with operation characteristics of pipeline assembly enterprise was proposed. The present model can realize synchronization in real-time response in production by establishing a win-win corporate model,classified regulation between strategic parts and non-strategic parts,postponing the production of special modules and guaranteeing production at the bottleneck. |
Key words:
SCM
production plan and control
postponement
bottleneck
|
|
Received: 2013-03-28
Revised:
|
DOI: |
Corresponding author:
Email: |
Author description:
|
|
|
|
|
|
|
|
References: |
|
|
[1] David Simchi-Levi,Philip Kaminsky. Supply Chain Design and Management[M]. Third Edition, China Renmin University Press,2010 [2] Vollmann T E,Berry W L. Manufacturing Planning and Control for Supply Chain Man-agement[M]. Fifth Edition,China Renmin University Press, 2010 [3] Liu G. Manufacturing Planning and Control of Pipeline Assembly Enterprise Under Supply Chain Management[D]. Xi'an Science and Engineering University (In Chinese) [4] Zhao Y P,Han Y Q,Ji M. Research on pro-duction planning and controlling pattern of virtual enterprise based on postponement[J].Chinese Mechanical Engineering, 2006,(12):57 ~59 (In Chinese) [5] Lin Z W,Ling X H,Ding Q L. Production planning and control for supply chain[J]. In-dustrial Engineering Journal Jul,2004:22 ~23 [6] Liu Q L. Study on Production Scheduling and Controlling System of Batch Production based on the Mixed Mode[D]. Jiangsu Technology University, 2005:12 ~13 (In Chinese) [7] Xie J H,Ye C M,Fu J Q. A study of enter-prise production planning and control based on the uncertainties of the supply chain[J].Modern Manufacturing Engineering,2009, 24(8) [8] Chen Z X,Ma S H,Chen R Q. Production planning and control system oriented for sup-ply chain [J]. High Technology Letters,2000, 76 [9] Han W M,Guo T X. Engendering of bull whip and con trolling of production planning based on TOC[J]. System Engineering,2005, (12):61 ~62 (In Chinese) [10] Qian B B,Qan X H,Chen Y D. Research of production planning and controlling system for manufacturing oriented AVE[J]. Machinery Design and Manufacture,2008, 64 (4):94(In Chinese) [11] Bolton R N,Lemon K N. The theoretical underpinnings of customer asset management:a framework and propositions for future research[J]. Journal of the Academy of Mar-keting Science, 2004, 32(3):271 ~292 |
|
|
|
|
|
|
|