[1]
|
徐滨士.工程机械再制造及其关键技术[J].工程机械,2009,40(8):1-6 Xu B S. Remanufacturing of construction machinery and its key technologies[J]. Construction Machinery and Equipment, 2009,40(8):1-6 (in Chinese)
|
[2]
|
Bentaha M L, Battaïa O, Dolgui A. Disassembly line balancing and sequencing under uncertainty[J]. Procedia CIRP, 2014,15:239-244
|
[3]
|
Li J R, Khoo L P, Tor S B. An object-oriented intelligent disassembly sequence planner for maintenance[J]. Computers in Industry, 2005,56(7):699-718
|
[4]
|
Li J R, Tor S B, Khoo L P. A hybrid disassembly sequence planning approach for maintenance[J]. Journal of Computing and Information Science in Engineering, 2002,2(3):28-37
|
[5]
|
Li J R, Khoo L P, Tor S B. Generation of possible multiple components disassembly sequence for maintenance using a disassembly constraint graph[J]. International Journal of Production Economics, 2006,102(1):51-65
|
[6]
|
Zhu B C, Sarigecili M I, Roy U. Disassembly information model incorporating dynamic capabilities for disassembly sequence generation[J]. Robotics and Computer-Integrated Manufacturing, 2013,29(5):396-409
|
[7]
|
刘志峰,胡迪,高洋,等.基于贪婪算法的产品拆卸序列规划[J].中国机械工程,2011,22(18):2162-2166 Liu Z F, Hu D, Gao Y, et al. Product disassembly sequence planning based on greedy algorithm[J]. China Mechanical Engineering, 2011,22(18):2162-2166 (in Chinese)
|
[8]
|
王淑旺,刘志峰,胡迪,等.基于不确定规划的产品拆卸序列规划[J].中国机械工程,2012,23(18):2143-2148 Wang S W, Liu Z F, Hu D, et al. Product disassembly sequence planning based on uncertain programming[J]. China Mechanical Engineering, 2012,23(18):2143-2148 (in Chinese)
|
[9]
|
张雷,彭宏伟,卞本阳,等.复杂产品并行拆解建模及规划方法研究[J].中国机械工程,2014,25(7):937-943 Zhang L, Peng H W, Bian B Y, et al. Parallel disassembly modeling and planning method of complex products[J]. China Mechanical Engineering, 2014,25(7):937-943 (in Chinese)
|
[10]
|
章小红,李世其,王峻峰.基于蚁群算法的产品拆卸序列规划方法[J].计算机辅助设计与图形学学报,2007,19(3):387-391,397 Zhang X H, Li S Q, Wang J F. Product disassembly sequence planning based on ant colony optimization[J]. Journal of Computer-Aided Design & Computer Graphics,2007,19(3):387-391,397 (in Chinese)
|
[11]
|
吴昊,左洪福.基于改进遗传算法的产品拆卸序列规划[J].中国机械工程,2009,20(6):699-703 Wu H, Zuo H F. Product disassembly sequence planning based on improved genetic algorithm[J]. China Mechanical Engineering, 2009,20(6):699-703 (in Chinese)
|
[12]
|
江吉彬,刘志峰,刘光复.基于工程语义信息的拆卸序列规划算法研究[J].计算机集成制造系统,2006,12(4):625-629 Jiang J B, Liu Z F, Liu G F. Research on disassembly sequence planning algorithm based on engineering semantic information[J]. Computer Integrated Manufacturing Systems,2006,12(4):625-629 (in Chinese)
|
[13]
|
郭伟祥,刘志峰,刘光复,等.基于模块化思想的拆卸序列规划[J].计算机辅助设计与图形学学报,2005,17(3):498-504 Guo W X, Liu Z F, Liu G F, et al. Disassembly sequence planning based on modularization[J]. Journal of Computer-Aided Design & Computer Graphics,2005,17(3):498-504 (in Chinese)
|
[14]
|
胡敏,王彦伟,聂斌,等.基于接触关系分析的装配序列规划[J].计算机辅助设计与图形学学报,2014,26(8):1734-1784 Hu M, Wang Y W, Nie B, et al. Assembly sequence planning based on contact-relation analysis[J]. Journal of Computer-Aided Design & Computer Graphics,2014,26(8):1734-1784 (in Chinese)
|
[15]
|
赵柏萱,刘检华,宁汝新,等.一种基于运动规划的选择拆卸序列规划技术[J].机械工程学报,2014,50(7):136-145 Zhao B X, Liu J H, Ning R X, et al. A motion planning based on selective disassembly sequence planning method[J]. Journal of Mechanical Engineering,2014,50(7):136-145 (in Chinese)
|