[1]
|
白静.柔性制造系统的生产物流调度仿真与分析[J].机械科学与技术,2013,(3):441-447 Bai J. Simulation and analysis of production logistics scheduling of flexible manufacturing system[J]. Mechanical Science and Technology for Aerospace Engineering, 2013,(3):441-447 (in Chinese)
|
[2]
|
采峰,曾凤章.基于订货型的流程型生产物流平衡方法研究[J].计算机集成制造系统,2007,13(1):158-164 Cai F, Zeng F Z. Method of process production logistics equi librium based on MTO[J]. Computer Integrated Manufacturing Systems, 2007,13(1):158-164 (in Chinese)
|
[3]
|
Guillaume R, Grabot B, Thierry C. Management of the risk of backorders in a MTO-ATO/MTS context under imperfect requirements[J]. Applied Mathematical Modelling, 2013,37(16-17):8060-8078
|
[4]
|
潘理,郭观七,欧阳竟成,等.柔性制造系统的时间 Petri 网建模与分析[J].计算技术与自动化,2013,32(2):105-108 Pan L, Guo G Q, Ouyang J C, et al. Modeling and analysis of flexible manufacturing system using time petri net[J]. Computing Technology and Automation, 2013,32(2):105-108 (in Chinese)
|
[5]
|
张新旭,张万良.基于赋时Petri网和GA的柔性制造系统调度[J].系统工程,2010,11,28(11):86-94 Zhang X X, Zhang W L. Timed Petri net based modeling and GA based schedul ing of flexible manufacturing system[J]. Systems Engineering, 2010,11,28(11):86-94 (in Chinese)
|
[6]
|
廖伟志,古天龙,王汝凉,等.基于混杂Petri网的柔性制造系统免疫调度算法[J].系统仿真学报,2010,22(1):205-209 Liao W Z, Gu T L, Wang R L, et al. Immune scheduling algorithm for FMS based on hybrid Petri nets[J]. Journal of System Simulation, 2010,22(1):205-209 (in Chinese)
|
[7]
|
Vieira G E, Herrmann J W, Lin E. Rescheduling manufacturing systems: a framework of strategies, policies, and methods[J]. Journal of Scheduling, 2003,6(1):39-62
|
[8]
|
上官春霞,周泓,师瑞峰,等.作业车间排序重调度问题及其改进修复约束满足算法[J].计算机集成制造系统,2008,14(9): 1742-1751 Shangguan C X, Zhou H, Shi R F, et al. Flow shop rescheduling problem and its improved repair-based constraint satisfaction algorithm[J]. Computer Integrated Manufacturing Systems, 2008,14(9):1742-1751 (in Chinese)
|
[9]
|
李莉,乔非,吴启迪.半导体制造重调度研究[J].中国机械工程,2006,17(6):612-616 Li L, Qiao F, Wu Q D. Research on rescheduling for semiconductor wafer fabs[J]. China Mechanical Engineering, 2006,17(6): 612-616 (in Chinese)
|
[10]
|
Veelenturf L P, Potthoff D, Huisman D, et al. Railway crew rescheduling with retiming[J]. Transportation Research Part C: Emerging Technologies, 2012,20(1):95-110
|
[11]
|
Törnquist K J. Design of an effective algorithm for fast response to the re-scheduling of railway traffic during disturbances[J]. Transportation Research Part C: Emerging Technologies, 2012,20(1):62-78
|
[12]
|
Espinosa-Aranda J L, García-Ródenas R. A demand- based weighted train delay approach for rescheduling railway networks in real time[J]. Journal of Rail Transport Planning & Management, 2013,3(1-2):1-13
|
[13]
|
王世进,周炳海,奚立峰.基于过滤定向搜索的柔性制造系统动态调度优化[J].上海交通大学学报,2007,41(1):94-99 Wang S J, Zhou B H, Xi L F. A filtered-beam-search based approach for FMS dynamic scheduling[J]. Journal of Shanghai Jiaotong University, 2007,41(1):94-99 (in Chinese)
|
[14]
|
Tzafestas S, Triantafyllakis A. Deterministic scheduling in computing and manufacturing systems: a survey of models and algorithms[J]. Mathematics and Computers in Simulation, 1993,35(5):397-434
|
[15]
|
Sawik T. Multi-objective master production scheduling in make-to-order manufacturing[J]. International Journal of Production Research, 2007,45(12):2629-2653
|